Radiant panel challenges overcome at Washington College of Law

Radiant panel challenges overcome at Washington College of Law

To provide the hot and chilled water in a four-pipe system for 4,180 panels, 12 miles of piping and more than 1,000 control valves were installed. The panels required an atypical piping configuration as the panels were grouped into zones and then interconnected with varying sizes of flexible hoses. Yet another challenge was organizing the three different panel types and three different panel sizes for installation.  

The Washington College of Law.

WASHINGTON, D.C. — The LEED Gold Washington College of Law, A

Register to view the full article

Registration on Contractor allows you exclusive access to high value content centered around proprietary research, expert analysis, and in-depth technical procedures.

Hide comments

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish