In an age of shrinking operational budgets, customers are demanding lower installation and maintenance costs even for state-of-the-art products. One manufacturer reveals how it keeps up by staying plugged in.

By GLENN BRENNEKE, SPX Cooling Technologies, Overland Park KS

Cooling tower customers want product innovations that can give them a greater amount of cooling for the energy used.

In this age of shrinking operational budgets, they also seek ways to reduce installation and maintenance costs. These customer needs cut across industry lines, whether for light industrial or heating, ventilation and air conditioning (HVAC) applications, or for power and process cooling operations.

To address these needs and develop the next generation of innovative evaporative cooling tower products, we focus on voice-of-the-customer input, trade organization activities, and validation of new concepts through product testing.

Innovating With the Customer's Voice

It’s not always easy to interpret what the market is signaling. Our product managers regularly collect voice-of-the-customer information, analyze it, and translate it into new concepts that can ultimately turn into product specifications. Additionally, innovative ideas can emanate from industry organizations that monitor trends and regulations, such as the Cooling Technology Institute (CTI), Air-Conditioning, Heating, and Refrigeration Institute (AHRI), and American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE).

One example of an innovation that emerged directly from specific customer input is the Marley® LW Fluid Cooler, an induced-draft, counterflow, closed-circuit fluid cooler. The design incorporates a new heat transfer technology and a closed-circuit design that keeps the process fluid in a clean, closed loop. In light of shrinking budgets and skilled labor pools, the market is demanding products that offer installation and maintenance advantages.   

According to one contractor who recently installed our product in a Columbus OH office building, its arrival at the job site fully assembled and factory-wired made a substantial difference and reduced total installation time to about one day. Electrical subcontracting costs were also minimized due to factory-wired controls. In addition, the fluid cooler's electronically commutated (EC) direct drive fans eliminated the need for a separate variable frequency drive and required virtually no maintenance.

The same design was also used at a Virginia Beach VA hotel, where low sound was another deciding factor. The hotel operator especially appreciated that business could continue as usual during installation. While some fluid coolers can require four or five days to install, this installation again took only one day.

Another example of innovation driven by our customers is the Marley NC® Everest Cooling Tower, developed to address the need for higher cooling efficiency and quiet tower operation. The factory-assembled, crossflow tower design offers 50 percent more cooling capacity per cell and uses up to 35 percent less fan power per ton of cooling, compared with other single-cell, factory-assembled cooling towers.

In addition to lower energy costs, the new technology also significantly reduces HVAC system installation costs. The NC Everest tower’s larger per cell cooling capacity also reduces the number of electrical and piping connections, which saves labor and material costs during assembly. The modular design speeds installation, a significant consideration, particularly for process cooling operations that need to replace the cooling tower but have only a short outage window to complete the project.

For example, when a highly secure data center in New York couldn’t afford exposure to unauthorized personnel for an extended period of time, it efficiently replaced a field-erected cooling tower with an NC Everest system. At this site, it only took five business days to install 5,000 tons of cooling capacity. If the customer had opted instead for the field-erected alternative, it likely would have taken six to eight weeks to complete!

Innovations Driven by Industry Activism 

Regardless of application or industry, contractors and end users want products that install without complications, operate reliably throughout their service life, and do not require frequent maintenance.

In addition to listening carefully to and understanding customer needs, our engineers and scientists actively participate in industry trade associations and monitor governmental agencies and other organizations that establish recommendations, guidelines and regulations that impact cooling tower design, operation and maintenance.

For example, SPX is closely allied with ASHRAE and serves on various committees to improve safe and effective evaporative cooling, refrigerant uses and fan efficiency. SPX is a strong proponent of ASHRAE Standard 188 – Legionellosis: Risk Management for Building Water Systems, which provides guidance on the development and execution of effective cooling tower water management plans.

SPX is also a member of the Alliance to Prevent Legionnaires’ Disease, a nonprofit coalition of health advocates, health providers, building engineers, scientists, water treatment experts and manufacturers, actively working to educate residents, building owners, policy makers, media representatives, water system managers and professionals, and government officials about the facts surrounding water quality, effective strategies for addressing the root causes of Legionnaires’, and better protecting public health.

Innovations Driven by R&D

The SPX Research and Development Center, located in Kansas City MO, generates and validates new product concepts, and conducts rigorous product testing to evaluate function and viability. The R&D Center also conducts continuous product training for SPX associates and commercial partners to ensure that they understand the design and operation concepts behind Marley towers and components. Customers also frequently visit to view first hand tests of performance, efficiency and reliability of cooling towers and their components, which are designed and modeled in house.

The facility is a climate-controlled, energy-efficient space that was originally a limestone cave. It occupies three acres underground, taking advantage of its controlled environment year-round. Above ground, seven acres provide ample space to build and test prototypes and new design concepts.

Specific research areas of cooling tower technology include fan development, thermal performance testing, sound and vibration testing, water distribution, heat exchange fill media modeling and destructive testing. The technological advances identified at the R&D Center have helped establish global standards for process cooling and for individual components. To date, SPX Cooling Technologies has been granted more than 181 U.S. patents for cooling tower designs and components.

Innovation Requires Collaboration

To broaden a company’s mindset and advance product development, it’s not enough to talk to customers and industry leaders; one must learn to listen intently and interpret effectively. Regularly connecting with customers, industry peers and other colleagues empowers ongoing feedback, smart conversations and solid ideas. To quote business guru and management expert Ken Blanchard: “None of us is as smart as all of us.”

The author is Vice President of Research and Development for Engineering and Product Management at SPX Cooling Technologies.

For more information please visit www.spxcooling.com