• POSITIONING BRACKET

    THIS POSITIONING BRACKET has been redesigned. Changes include placing all ½" copper stub-out holes at the same height, providing a 3.42" centerline in relation to the waste pipe. Other changes include a snap-lock band and the addition of an 8" piece of ...
    Aug. 10, 2010

    THIS POSITIONING BRACKET has been redesigned. Changes include placing all ½" copper stub-out holes at the same height, providing a 3.42" centerline in relation to the waste pipe. Other changes include a snap-lock band and the addition of an 8" piece of self-adhesive felt to each bag.

    Sioux Chief
    CIRCLE 112 ON INQUIRY CARD

    Sign up for Contractor Newsletters
    Get the latest news and updates.

    Voice Your Opinion!

    To join the conversation, and become an exclusive member of Contractor, create an account today!